15 Nov 2017

Our First Home Construction Update

(Taken 9th September 2017)

It's been about 2.5 months since my last post.

Thought I'd document things we discovered or learnt over past two months:
  • Document all the change or variations. The builder will miss items you discussed with them, not respond to all questions in your email, and they'll forget to follow up on things. We realised they could be interacting with a few clients at a time. We had to be proactive and double check everything, question difference in design and contract and get clearly written answers on all our questions before we signed. Even the small things we question, for example, comparing construction drawings versus the contract. If the drawing didn't reflect it on the contract we raised it. Most got updated but some they said wasn't necessary to be updated for whatever reason. We trust everything will go smoothly and to design but we made sure we had written evidence of things just in case of conflict later on. 
  • Master builders that build homes in the volumes avoid custom once off work/jobs. After our appointments, there were things we saw that we wanted to try and get our builder to do. They really avoid custom work, even if you're willing to pay for it. Some of the items that our builder couldn't accommodate: a slight decline on our stone island beach top near the sink for water waste, rectangle tiled drain waste, long handles for our sliding doors, and shadow line cornice. 
  • You'll start to find things you've missed or doubting decisions. Already I'm regretting not doing walk-in wardrobes in all the bedrooms. I'm second guessing not doing a butler's pantry and cabinetry in our laundry. Although we can add these items later on, it would be nicer if everything was done and matched day one. I'm questioning if there's enough natural light our master bedroom? Maybe we should have made the window bigger or added another window to another wall. Now I'm realising maybe I should have made the door to the pantry a sliding one. Do I really want all our walls to be white? I've just started reaccessing decisions.  
I can finally say our build has started. Our contract started we would start 2nd October but it wasn't until the 18th November we received an email stating our builder has everything they need to start building and a site manager was allocated to manage the construction of our home.

(Taken 9 November 2017)

We got a call from said site manager, about a week later who introduced himself and gave us a verbal timeframe of when things will start. He said the land will start to be cleared in preparation for drainage, electrical works then pouring of the slab. That's basically where we're at now. I believe they give the slab about a week to harden and assess whether the slab needs any additional work.

Hopefully, there will be more work done on the house between now and the holiday break. I'm sure the frames will be up so the builder can request for the next progress payment before Christmas. 